Designing of Ljubljana wastewater treatment plant enlargement (550,000 PE) 2018-2022

Customer: Vodovod-Kanalizacija d.o.o

Wastewater treatment plant load 550,000 PE, Q=117,000 m³/dd=117 00 m3/d

Wastewater treatment plant

  • Preliminary settlement tank,
  • Activated sludge treatment tanks with technological equipment,
  • Chemical phosphorous removal,
  • Cloth filtration,
  • Enlargement of sludge treatment.

Sludge management

  • Support for sludge digester design for Veolia OTV

Service offered

  • Surveys,
  • Development of the basic concept,
  • Feasibility study,
  • Detailed design,
  • Construction working documents.